Performance Summary

Estimate Performance Summary

Access the pricing story for your active project and fine-tune how the final number is built.

Project -
Live totals
0.0%
Base Cost Total 0.00 Marked-up subtotal from estimating-driven cost types.
0 types
Source Estimate 0.00 Raw estimating value before summary markups are applied.
0.0%
Direct Cost Lane 0.00 Execution-side overlays including supervision and logistics.
0.0%
Indirect Cost Lane 0.00 Risk, overhead, and strategic contingency layers.
Audience Growth

Estimate growth curve

Live view

Track how markup lift and overlays move the project from source estimate to final sell number.

Base Rollup 0.00 Marked-up base subtotal
Average Markup 0.0% Across all base cost types
Grand Total 0.00 Final price with overlays

Pricing signal

Base-cost markup is currently carrying the majority of the final price.

Source estimate

Raw estimate 0.00 before pricing overlays are applied.

Markup momentum

Grand total is running at 1.00x over raw input cost.

Overview

Base cost markups

Live editor
Profiles

Overlay cost controls

Direct Cost Field-side execution allowances and jobsite support.
Marked-up total 0.00
Indirect Cost Corporate load, contingency, and strategic buffer.
Marked-up total 0.00